When you’re managing a new build, time is tight, details matter, and every trade has to deliver. That’s why working with a waterproofing partner who’s got your back from planning through to PS3 handover makes all the difference.
At SJ Waterproofing NZ, we’ve built our process around the real-world needs of Auckland builders. It’s not just about applying membranes—it’s about making sure your build stays compliant, on schedule, and watertight for the long haul.
Here’s how we do it:
Step 1: Plan Review & Scope Definition
We start where every good build starts—with the plans. Before we even step on site, we sit down with your architectural and structural drawings. We highlight every area that needs waterproofing and create a clearly coded scope that’s easy to follow on-site.
This isn’t just helpful—it’s essential. Getting clarity early helps avoid miscommunication and makes sure waterproofing fits into the overall build timeline.
Step 2: Pre-Job Site Visit
Once the scope is locked in, we visit the site. This allows us to see conditions first-hand, identify access issues, and clarify timing with the site manager.
Our goal is to work with your team, not against them. We’ll make sure our install fits seamlessly into your workflow—and we’re always available for on-the-ground questions and guidance.
Step 3: System Selection
Every build is different, and so is every membrane system. We work with all major suppliers and select products based on:
- The specific application area
- Substrate and surface prep requirements
- Weather exposure and timing
- Council requirements
- Desired warranty coverage
No guesswork. No shortcuts. Just the right system for your job.
Step 4: On-Site Application
Our licensed team installs your waterproofing systems with a focus on quality, timing, and communication. Whether it’s under-slab tanking, retaining walls, decks, or internal wet areas—we do it right the first time.
We coordinate with other trades and keep things moving smoothly to avoid costly delays.
Step 5: Quality Assurance Checks
We don’t just install and walk away. We check every stage of the install:
- Moisture readings and surface prep validation
- Membrane thickness and coverage
- Detailing around junctions and penetrations
- Full photo documentation throughout the job
Our QA tools ensure consistency—and our documentation proves it.
Step 6: Compliance & Close-Out
Once the job is complete, we provide a full documentation pack including:
- PS3 producer statements
- Record of Work (ROW) where applicable
- Manufacturer warranties
- QA photo documentation
This gives your client peace of mind and your inspector everything they need for sign-off.
Why It Works
Our process isn’t just about ticking boxes. It’s about supporting your build at every stage. From the first phone call to the final sign-off, we’re on the job.
Builders across Auckland trust SJ Waterproofing because we:
- Communicate clearly and consistently
- Turn up when we say we will
- Know our systems inside out
- Deliver full compliance—without chasing
Ready to Work With a Waterproofing Partner You Can Rely On?
Let’s take the stress out of waterproofing. Whether you’re in early planning or midway through your build, we can step in and make sure everything runs smoothly from here.
Send us your plans or give us a call. We’ll get you sorted.
Ready to Protect Your Next Build?
If you have an upcoming project and need expert foundation waterproofing, we are ready to help.
Contact SJ Waterproofing NZ today to discuss your plans and get a professional quote that sets you up for success from the ground up.